India's Trusted Estimation Partner  •  IS 1200 Compliant  •  Accurate BOQs  •  Bangalore & PAN India
Home / Services / Quantity Takeoff
Digital Drawing Takeoffs

Quantity Takeoff (QTO) Services

Rigorous dimensional extraction of structural, civil, and finishing quantities directly from 2D CAD drawings and 3D BIM models with formula-linked measurement sheets.

Submit Drawings for Takeoff WhatsApp Takeoff Inquiry

Comprehensive Trade Quantities Extracted

Quantity takeoff is the technical engine that drives accurate cost estimation and procurement. Every dimension is traced, measured, and verified with cross-checking between plan views, elevations, and structural reinforcement schedules.

CONCRETE VOLUME

Concrete Volumetric Takeoff (Cum)

Element-by-element concrete volume extraction from footings, grade slabs, shear walls, columns, beams, and roof slabs with drawing cross-tags.

Precision Standard: ±0.5% Accuracy
Deliverable Format: Grid-Linked Takeoff Sheets
Compliance Code: IS 1200 Part 2
  • Discrete volume registers per building floor
  • Deductions for openings > 0.1 cum applied strictly
  • Grade-wise segregation (M20, M25, M30, M35)
Concrete Volume (cum) = Length × Width × Depth [Less Deductions]
SP 34 BBS

Steel Rebar Bar Bending Schedules (MT)

Bar-by-bar takeoff detailing bar marks, diameter sizes (8mm to 32mm), cutting lengths, hook lengths, and bend deductions.

Precision Standard: Zero Waste Ambiguity
Deliverable Format: BBS Summary Matrix
Compliance Code: SP 34 & IS 2502
  • Dia-wise steel classification from 8mm to 32mm
  • Calculated rolling margin and 2.5% lap allowance
  • Direct manufacturer purchase indent formatting
Unit Wt (kg/m) = Dia² / 162.28 | Bar Total = Length × Unit Wt × Count
FORMWORK AREA

Shuttering & Staging Area (Sqm)

Contact surface measurements for footing sides, column faces, beam soffits, and ceiling slabs separated by reuse cycle specifications.

Precision Standard: Precision Contact Sqm
Deliverable Format: Trade-Wise Measure Sheets
Compliance Code: IS 1200 Part 5
  • Formwork separated into vertical, soffit, and circular
  • Staging height classes categorized above 3.5m
  • Standard chamfer and intersection deductions
Beam Shuttering = (Bottom Width + 2 × Side Height) × Clear Length
MASONRY & FINISHES

Masonry, Plaster & Finish Takeoffs (Sqm)

Wall surface area, blockwork volume, internal/external plastering, waterproofing, and tile flooring with opening deduction rules.

Precision Standard: IS Standard Rules
Deliverable Format: Workbook with Formulas
Compliance Code: IS 1200 Part 3, 11, 12
  • Masonry block counts with mortar bed offsets
  • External groove plaster and waterproofing bands
  • Floor finish and tile border skirting schedules
Plaster Sqm = Wall Area × 2 Faces - Deductions [Opening Rules Compliant]
Audit Ready

Drawing Cross-Reference Guarantee

Every line in our Excel measurement sheet is tagged with the corresponding drawing sheet number, grid axis references (e.g. Grid A-D / 1-4), and structural mark (e.g. C1, C2, B12). You or your project auditor can trace any quantity directly back to the architectural drawing.

DIRECT CLIENT VAULT

Inspect Real Civil Estimation Deliverable Models

Want to see real unpriced BOQs, unit rate analysis spreadsheets, or tender normalization matrices? Open our unlocked models vault directly on your mobile or desktop.

Open Models Vault (or Scan QR) →
Need an Estimate for This Service?
Send your architectural or structural plans for an audit-ready proposal within 2–4 hours.
Request an Estimate → Explore Sample Models
WhatsApp Chat AskTEC AI Assistant