Sample Estimation Models & Deliverables

Review genuine civil engineering calculation sheets before appointing us. Every model is prepared under Bureau of Indian Standards IS 1200, featuring unlocked formulas, itemized deduction logs, and trade-wise procurement breakdowns.

📊 12 Realistic Engineering Models
🔓 100% Unlocked Excel Sheets
⚡ Instant QR Mobile Hand-Off
Explore All 12 Models ↓ Request Full Sample Pack (ZIP)
📱 SCAN OR SHARE WITH CLIENT
DIRECT VAULT ACCESS
Scan to open TEC Estimation Models Vault on Mobile
Scan with Camera
Show this QR code to your client or site team:
Instantly opens all 12 BOQ, Tender, and Rate Analysis sample models on their smartphone.
Share Vault on WhatsApp
DISCIPLINE 01 · TENDER & BILLING SCHEDULES

Bill of Quantities (BOQ) Models

Fully structured, itemized work packages formatted under Bureau of Indian Standards IS 1200. Built with contractor bidding columns and active math formulas.

IS 1200 / CPWD WORK PACKAGING
MODEL BOQ-01 · RESIDENTIAL XLSX / PDF

G+2 Luxury Residential Villa

Bangalore North · 4,800 sq.ft Built-Up Area
Total Value: ₹1,48,60,000
Work Packages: 14 Civil & Finishes
Standard: IS 1200 (Part 1-28)
Formulas: 100% Unlocked
Item Description Unit Qty Rate (₹) Amount (₹)
1.01 Earthwork excavation in foundation Cum 184.50 240.00 44,280
1.04 P.C.C. 1:4:8 under footings & plinth Cum 24.80 5,400.00 1,33,920
2.02 R.C.C. M25 in Footings & Pedestals Cum 42.60 7,450.00 3,17,370
3.01 Fe 550D TMT Rebar (8mm–25mm) MT 18.45 68,500.00 12,63,825
4.03 200mm AAC Solid Block Masonry Sqm 420.00 1,085.00 4,55,700
  • Detailed substructure, super-structure, waterproofing, and marble finishes.
  • Clear opening deduction math for doors, French windows, and skylights.
  • Ready for contractor tendering and running account billing.
MODEL BOQ-02 · COMMERCIAL XLSX / PDF

Commercial Complex B+G+8

Whitefield Hub · 64,000 sq.ft Built-Up Area
Total Value: ₹19,85,00,000
Work Packages: 26 Specialized Divisions
Foundation: Secant Piling & Raft
Superstructure: Post-Tensioned Slabs
Item Description Unit Qty Rate (₹) Amount (₹)
0.03 Secant bored cast-in-situ piles 600mm Rmt 1,480.00 4,200.00 62,16,000
1.08 R.C.C. M35 in Basement Raft 900mm Cum 920.00 8,600.00 79,12,000
2.14 Post-Tensioning (PT) Tendons & Anchors MT 38.50 1,42,000.00 54,67,000
5.02 DGU Structural Glazing Façade System Sqm 2,450.00 6,800.00 1,66,60,000
8.01 VRV/VRF Air Conditioning HVAC Ducting HP 380.00 34,500.00 1,31,10,000
  • Deep basement retention shoring and dewatering schedules itemized.
  • Post-tensioned beam/slab schedules and high-spec glass façade division.
  • Comprehensive MEP, firefighting, and lift shaft interfaces.
MODEL BOQ-03 · INDUSTRIAL XLSX / PDF

Industrial PEB Warehouse Park

Dabaspete Logistics Hub · 1,20,000 sq.ft
Total Value: ₹14,20,00,000
Structure: Pre-Engineered Building
Flooring: Trimix VDF 200mm
Roofing: Standing Seam Metal
Item Description Unit Qty Rate (₹) Amount (₹)
1.02 Heavy mechanical site grading & filling Cum 8,400.00 180.00 15,12,000
2.05 PEB Primary Structural Steel (Built-up) MT 410.00 98,000.00 4,01,80,000
2.08 Cold-Formed Z/C Purlins & Girts MT 112.00 92,500.00 1,03,60,000
3.04 200mm VDF Trimix Industrial Flooring Sqm 10,800.00 1,150.00 1,24,20,000
4.01 Color Coated Galvalume Standing Seam Roof Sqm 11,400.00 720.00 82,08,000
  • Heavy civil earthwork, drainage channels, and loading dock pits.
  • Detailed structural steel fabrication tonnage and connection hardware.
  • VDF heavy machinery floor laser leveling & expansion joint sealing.
DISCIPLINE 02 · CONTRACTOR BID AUDIT & NEGOTIATION

Tender Analysis & Bid Evaluation Models

Cross-level contractor proposals, normalize commercial exclusions, identify dangerous front-loaded billing rates, and negotiate from verifiable mathematical authority.

COMMERCIAL RISK MITIGATION
MODEL TND-01 · COMPARISON XLSX MATRIX

5-Bidder Commercial Normalization

Multi-Unit Commercial Plaza Tender Evaluation
Engineers Estimate: ₹8.45 Crores
Bids Evaluated: 5 General Contractors
Spread Detected: ₹7.82 Cr to ₹9.95 Cr
Savings Achieved: ₹38.5 Lakhs Normalized
Trade Package Engineer Base Bidder A Bidder B (L1) Bidder C Variance
1. Earthwork & Piling ₹98.50 L ₹105.20 L ₹128.40 L [FL] ₹96.10 L +30.4%
2. RCC Structure ₹342.00 L ₹358.00 L ₹312.00 L ₹365.00 L -8.7%
3. Masonry & Plaster ₹92.00 L ₹88.50 L ₹84.00 L ₹95.20 L -8.6%
4. Flooring & Finishes ₹165.00 L ₹172.00 L ₹138.00 L [EX] ₹178.00 L -16.3%
RAW TOTAL ₹845.00 L ₹878.50 L ₹782.00 L ₹895.00 L L1 Apparent
NORMALIZED TOTAL ₹845.00 L ₹862.00 L ₹856.40 L ₹880.00 L L1 Corrected
  • Normalized hidden exclusions: Bidder B omitted GST on steel and pump charges.
  • Identified deceptive low headline price that would have triggered huge claims.
  • Delivered definitive negotiation agenda item-by-item for developer leadership.
MODEL TND-02 · FORENSIC AUDIT XLSX AUDIT

Unbalanced Rate & Front-Loading Audit

Preventing Contractor Cash-Flow Drain & Default Traps
Risk Analyzed: Early Milestone Inflation
Substructure Markup: +45% Above Market
Finishing Deficit: -32% Below Realistic
Exposure Blocked: ₹42.50 Lakhs
Milestone Work Item Fair Rate Bidder Quoted Deviation % Risk Evaluation
Basement Bulk Excavation ₹240/Cum ₹420/Cum +75.0% High Front-Loading Risk
P.C.C. 1:4:8 Bedding ₹5,200/Cum ₹7,800/Cum +50.0% Early Cash Extraction
Retaining Wall R.C.C. M30 ₹8,800/Cum ₹11,600/Cum +31.8% Unbalanced Margin
Granite & Marble Flooring ₹480/Sqm ₹310/Sqm -35.4% Below Cost (Abandonment Trap)
Waterproofing Membrane ₹145/Sqm ₹92/Sqm -36.5% Substandard Material Threat
  • Flags contractors attempting to pocket 70% of profit during the first 25% of work.
  • Calculates developer capital deficit curve if contractor abandons at lock-in stage.
  • Provides counter-balanced milestone retention terms for contract protection.
MODEL TND-03 · SPEC COMPLIANCE PDF / DOCX

Tender Scope & Spec Schedule

Definitive Packaging, Testing Codes & Vendor SLA Schedule
Trade Scope: Civil, MEP & Finishes
Approved Makes: 3 Tiers per Trade
Testing Norms: IS 456 / IS 516 / IS 1786
Penalty Terms: Milestone SLA Linked
Trade Package Primary Specification Approved Brands Mandatory Testing Protocol
Structural Steel Fe 550D TMT Rebar (IS 1786) Tata Tiscon, JSW, Jindal 1 test per 10 MT (Tensile & Bend)
Structural Concrete Ready-Mix M30 (IS 456) UltraTech, ACC, RDC 6 cubes per 50 Cum (7 & 28 days)
Internal Walls Solid Concrete Blocks (IS 2185) Sobha, Godrej, Certified Compressive strength > 5.0 N/mm²
Waterproofing 2-Component Polyurethane Elastomer Dr. Fixit, Fosroc, Sika 72-hour flood ponding test
Joinery Windows Thermal-Break UPVC / Aluminum Kommerling, Fenesta, Schuco Wind load & water ingress certified
  • Eliminates contractor substitution of cheap unbranded materials on site.
  • Binds contractor to mandatory third-party lab testing certificates before bill clearance.
  • Protects developer against ambiguous quality definitions and rework claims.
DISCIPLINE 03 · FIRST-PRINCIPLES UNIT COSTING

Rate Analysis Models (Item Breakdown)

Unit cost formulation calculated from exact physical constants: material consumption, skilled/unskilled labor days, equipment hire, and 15% contractor overhead & profit.

CPWD & DSR BENCHMARKED
MODEL RAT-01 · CONCRETE XLSX FORMULA

RCC M25 Concrete (per 1 Cum)

Ready-Mix Pumping with 15% Contractor Overhead & Profit
Final Unit Rate: ₹7,432.45 / Cum
Materials Cost: ₹5,163.00 (69.5%)
Labor & Machinery: ₹1,300.00 (17.5%)
Contractor OH & Profit: ₹969.45 (13.0%)
Cost Component Quantity Unit Base Rate (₹) Subtotal (₹)
OPC 53 Grade Cement 7.60 (380 kg) Bags 380.00 2,888.00
Graded Granite Aggregate (20mm) 0.85 Cum 1,450.00 1,232.50
Manufactured Sand (M-Sand) 0.45 Cum 1,650.00 742.50
Water Reducing Admixture 2.50 Ltr 120.00 300.00
Concrete Pump Hire & Vibrators 1.00 Cum 450.00 450.00
Mason, Bhisti & Concrete Gang 1.00 Cum 850.00 850.00
Prime Cost of Materials & Labor ₹6,463.00
Add 15% Contractor Overhead & Profit ₹969.45
  • Based on standard 1:1.5:3 volumetric reconciliation and design mix water-cement ratio.
  • Includes batching plant delivery, concrete boom placer hire, and compaction labor.
  • Prevents contractor markup inflation during extra work items.
MODEL RAT-02 · MASONRY XLSX FORMULA

200mm AAC Blockwork (per 1 Sqm)

Thin-Bed Polymer Adhesive with Reinforcement Mesh
Final Unit Rate: ₹1,084.91 / Sqm
Block Thickness: 200mm Solid Block
Mortar Type: Thin-Bed Polymer Adhesive
Joint Size: 3mm Precision Joint
Cost Component Quantity Unit Base Rate (₹) Subtotal (₹)
AAC Blocks (600x200x200mm) 8.33 Nos 80.00 666.40
Polymer Block Jointing Adhesive 4.00 Kg 18.00 72.00
GI Wire Mesh at Every 3rd Course 0.50 Rmt 70.00 35.00
Skilled Block Mason & Helper 0.14 Day 1,000.00 140.00
Scaffolding & Water Curing 1.00 Sqm 30.00 30.00
Prime Cost of Materials & Labor ₹943.40
Add 15% Contractor Overhead & Profit ₹141.51
  • Saves 25% dead load compared to traditional burnt red bricks.
  • Thin-bed polymer mortar reduces water consumption and curing duration on site.
  • Includes crack control horizontal bond beam and joint reinforcement allowances.
MODEL RAT-03 · FINISHES XLSX FORMULA

External 2-Coat Plaster 20mm (per 1 Sqm)

Waterproof Sand-Faced Plaster (12mm Base + 8mm Finish)
Final Unit Rate: ₹401.29 / Sqm
Base Coat: 12mm Cement Mortar 1:4
Finish Coat: 8mm Cement Mortar 1:3
Additive: Integral Waterproofing
Cost Component Quantity Unit Base Rate (₹) Subtotal (₹)
Cement for Base Coat 1:4 (12mm) 7.20 Kg 7.60 54.72
P-Sand for Base Coat (12mm) 0.024 Cum 1,650.00 39.60
Cement for Finish Coat 1:3 (8mm) 5.80 Kg 7.60 44.08
Fine Washed River/Silica Sand 0.017 Cum 1,650.00 28.05
Integral Waterproofing Liquid 0.25 Kg 130.00 32.50
Skilled Plasterer & Labor Gang 0.12 Day 1,040.00 124.80
External Double Staging Scaffolding 1.00 Sqm 25.00 25.20
Prime Cost of Materials & Labor ₹348.95
Add 15% Contractor Overhead & Profit ₹52.34
  • Grounded in IS 1200 Part 12 deduction rules (zero deductions for ends of joists/beams).
  • Calculates exact bulk sand volume and cement bag ratios with realistic bulking factors.
  • Accounts for exterior metallic pipe scaffolding and 7-day water curing overheads.
DISCIPLINE 04 · MATHEMATICAL GEOMETRY & AUDIT TRAILS

Quantity Takeoff (QTO) & Measurement Sheets

Step-by-step Length × Breadth × Depth entries linked directly to CAD drawing sheet numbers, including Bar Bending Schedules (BBS) under SP 34 & IS 2502.

ZERO THUMB-RULES · 100% DRAWING LINKED
MODEL QTO-01 · SUBSTRUCTURE XLSX LOG

Foundation Footing Measurement Sheet

Grid-by-Grid Excavation, PCC & Concrete Takeoff
Drawing Ref: DWG-STR-F01 / Rev 03
Footing Types: F1, F2, F3 Combined
Total Excavation: 184.50 Cum
RCC Volume: 42.60 Cum
Grid Location Footing Type Nos Length (m) Breadth (m) Depth (m) Quantity Unit
Grids A1, A4, D1, D4 F1 Excavation 4 2.40 2.40 1.80 41.47 Cum
Grids B2, B3, C2, C3 F2 Excavation 4 2.80 2.80 1.80 56.45 Cum
Grids A2-A3 Combined CF1 Excavation 2 5.20 2.60 2.10 56.78 Cum
All Footings Bed PCC 1:4:8 (100mm) 10 L+0.3 B+0.3 0.10 14.20 Cum
F1 Footing Pads RCC M25 (Pads) 4 1.80 1.80 0.45 5.83 Cum
  • Working space offset of 300mm added for formwork erection per IS 1200.
  • Calculates trapezoidal footing sloped portion using exact prismoidal volume formula.
  • Backfilling volume derived by deducting all masonry, columns, and concrete mass.
MODEL QTO-02 · SUPERSTRUCTURE XLSX LOG

Column & Floor Beam Measurement Register

Floor-wise Concrete Volumes & Shuttering Contact Area
Drawing Ref: DWG-STR-C02 / S03
Columns: 18 Members (C1-C18)
Floor Height: 3.30m Clear Height
Shuttering Area: 482.50 Sqm Contact
Member Tag Floor Level Nos Breadth (m) Depth (m) Height (m) Concrete (Cum) Formwork (Sqm)
C1-C8 (400x600) Ground Floor 8 0.40 0.60 3.30 6.34 52.80
C9-C14 (300x450) Ground Floor 6 0.30 0.45 3.30 2.67 29.70
PB1-PB8 (Main Beam) Plinth Level 8 0.30 0.45 5.40 5.83 38.88
TB1-TB12 (Tie Beam) Plinth Level 12 0.23 0.30 3.80 3.15 27.36
Floor Slab S1 (150mm) First Floor 1 18.40 12.20 0.15 33.67 224.48
  • Separates concrete volumes from formwork surface contact area strictly under IS 1200.
  • Deducts beam-column junction intersections to prevent double billing by contractors.
  • Tied to steel bar bending diameter classifications for structural reconciliation.
MODEL QTO-03 · STEEL BBS XLSX / BBS

Bar Bending Schedule (BBS)

SP 34 & IS 2502 Compliant Rebar Fabrication Matrix
Total Steel: 24.85 Metric Tonnes
Standard: SP 34 & IS 2502
Bend Deduction: 2d (90°) / 3d (135°)
Wastage Reduction: < 2.5% Scrap Loss
Member & Bar Mark Bar Shape Dia (mm) Nos Cutting Length (m) Total Length (m) Unit Wt (kg/m) Total Wt (kg)
F1 Bottom Mesh (X) U-Shape 16 14 2.45 34.30 1.58 54.19
F1 Bottom Mesh (Y) U-Shape 16 14 2.45 34.30 1.58 54.19
C1 Main Longitudinal Straight+L 20 8 4.85 38.80 2.47 95.84
C1 Column Ties (Stirrups) 135° Hook 8 28 1.85 51.80 0.395 20.46
PB1 Bottom Main Reinforce L-Cranked 25 4 6.20 24.80 3.85 95.48
  • Automatic standard bend deduction calculations (1d for 45°, 2d for 90°, 3d for 135°).
  • Summarizes diameter-wise procurement tonnage (8mm, 10mm, 12mm, 16mm, 20mm, 25mm, 32mm).
  • Directly usable for factory rebar cutting & bending, cutting scrap loss to under 2.5%.
Request Unlocked .XLSX on WhatsApp
✓ Vault link copied to clipboard! Ready to share with client.
🛡️
Need an Estimate for Your Project?
Send your architectural CAD/PDF drawings for an audit-ready proposal within 2–4 hours.
→
WhatsApp Chat AskTEC AI Assistant