India's Trusted Estimation Partner  •  IS 1200 Compliant  •  Accurate BOQs  •  Bangalore & PAN India
Home / Case Studies
EVIDENCE OF MATHEMATICAL ACCURACY

Project Track Record & Cost Audits

Review how our independent IS 1200 cost modeling, contractor bid normalization, and quantity reconciliation protected project budgets across South India. (Client identities anonymized for NDA confidentiality).

Inspect Matching Sample Models → Request Scoping Discussion
VERIFIED BENCHMARKS

Featured Engineering Case Studies

Click on any project card below to open the complete case audit, inspect multiple CAD blueprints & model screenshots, and review forensic deduction outcomes.

💡 TIP: Click any card to inspect blueprints
Contemporary Villa CAD Plan and Bar Bending Schedule Residential Luxury ₹14.5 Lakhs Saved 3 Drawings & Photos
CASE 01 • BANGALORE NORTH • G+2 STRUCTURE

Contemporary Villa G+2 Structural Takeoff & BOQ

Intricate private villa with double-height cantilevers and Italian stone received contractor lumpsum bids varying by over 35%. TEC derived exact concrete and rebar volumes, eliminating contractor over-ordering.

Structural Scope: 318.5 m³ Concrete • 29.4 MT Rebar
Audit Result: 11% Rebar Waste Cut • Locked Rates
Commercial Complex Tender Normalization Analytics Dashboard Commercial Tender ₹38.5 Lakhs Normalized 3 Drawings & Photos
CASE 02 • WHITEFIELD HUB • B+G+8 COMPLEX

Commercial Complex B+G+8 Tender BOQ & Bid Scrutiny

Disparate contractor bids from ₹7.82 Cr to ₹8.95 Cr had conflicting GST and deep basement piling allowances. TEC generated an IS 1200 tender schedule and uncovered severe front-loading.

Tender Scope: 26 Trade Packages • 5 Bidders
Audit Result: Avoided ₹34 Lakhs Front-Load Trap
Industrial PEB Steel Structure and BIM Shop Drawing Industrial Warehouse Zero Variation Claims 3 Drawings & Photos
CASE 03 • DABASPETE PARK • 1,20,000 SQ.FT

1,20,000 sq.ft Industrial PEB Logistics Facility

Fast-track warehouse needed heavy Trimix VDF flooring and pre-engineered steel frames. TEC executed complete 3D digital takeoffs for 522 MT steel and created factory-direct BOM schedules.

Structural Scope: 410 MT Main Frames • 112 MT Purlins
Audit Result: Delivered in 4 Mo • Zero Variations
Certified Measurement Sheets and RA Billing Audit Screen Forensic Cost Audit ₹56.2 Lakhs Disallowed 3 Drawings & Photos
CASE 04 • SARJAPUR CORRIDOR • ₹22.5 CR CAMPUS

Institutional Campus Running Account (RA) Billing Audit

An educational trust expansion faced aggressive contractor variation claims and duplicate measurement entries at beam-column junctions. TEC audited 14 RA bills under IS 1200 deduction rules.

Audit Scope: 14 RA Bills • Redline Overlays
Audit Result: ₹56.2 L Withheld • Dispute Resolved
🛡️